LIFTING, ROTATION AND INSTALLATION OF VESSELS UP TO 900 TON WITH UNGUYED TOWER LIFT SYSTEM
In 2009 the company Chunjo Fagioli Ltd was formed with both Fagioli and Chunjo taking a fifty per cent stake Chunjo-Fagioli is a joint venture company 50%.
Chunjo-Fagioli ltd. were awarded for the lifting and installation of three major components in Korea for the HDO-2 project.
The biggest one was a reactor weighing 900 ton, than a regenerator weighing 424 ton and a splitter 600 ton, 92 mts high.
There are several points to highlight in order to focus the peculiarity of these operations. First of all, the use of an un-guyed 100 mt high tower lift with strand jacking system. Moreover the regenerator was not only lifted but also rotated and positioned onto plinths at a height of 54 mts.
Considering the flexibility and performances of Fagioli tower lift system and the vast range of high capacity crawler cranes provided by Chunjo, in Korea the company can provide a unique and peculiar lifting and installation package (including also the heavy transport activities with Spmt's), which can satisfy any kind of hoisting request.
|